Skip to content
SAMPLE SITE — the business is fictitious. This is what a site made by Parvi Sait looks like. A site like this — from €390. I want a site like this →
Statika engineering bureau · Smolyan Book a site visit

Engineering bureau · Smolyan · since 2004

The building, read to the last layer.

Design · renovation · tolerance · passports

418 signed projects · three licensed designers

Designs for houses and extensions, structural engineering, energy efficiency, tolerance certificates and building passports. Price and time per part — within 2 working days of the site visit.

Detached house · Raykovo, SmolyanSection 1–1 · Scale 1:50
Section 1–1 through a two-storey house, scale 1:50 Section drawing of a house: footings in the soil, ground floor slab, brick walls with facade insulation, two reinforced-concrete slabs, ceiling insulation and a timber roof with tiles. Every layer is hatched to the standard and has a numbered item.

Items on the sectionSheet 3 / 12

Pick an item on the drawing

Every layer tells you what the material is, how thick it is and how well it lets heat through (λ). That is how we read your building too — layer by layer.

Services

Price and time — before you have paid

The price depends on the gross floor area and on what you already have. We put the exact amount in the quote, part by part — within 2 working days of the site visit.

01

House design

All parts: architecture, structures, water and drainage, electrical, energy efficiency, surveying, fire safety, health and safety plan and construction waste plan. Water and drainage, electrical, surveying and fire safety are signed by our permanent partners with full design licences. Technical control and the energy-efficiency assessment are separate, from €300.

5–8 weeks3 600 €up to 120 m² GFA
02

Structural part

For another architect’s design: structural calculations, formwork and reinforcement drawings, details.

3–5 weeks€9/m²minimum €900
03

Energy audit and certificate

Site visit, measurements, a model of the building, measures with a savings calculation and an energy performance certificate — for buildings we have not designed (ZEE, the Energy Efficiency Act, Art. 43(4)). Blocks of flats — on quote.

2–4 weeks420 €house up to 120 m²
04

Renovation design

Insulation details around windows, balconies and the plinth; anchoring; fire safety of the facade.

3–5 weeks1 200 €house up to 120 m²
05

Structural report

Before an extension, an extra storey, a new opening in a wall or buying an old house: site visit, trial pits if needed, a written report.

1–2 weeks220 €
06

Tolerance certificate

Survey, structural report and the documents for the municipality. For a building put up without permits by 31 March 2001. A newer building without a permit cannot be legalised — we tell you so at the site visit.

4–11 weeks500 €up to 120 m²
07

Technical passport

Under Ordinance No. 5 — renovation programmes require it. A survey of an existing building; the passport is drawn up by whoever surveyed it.

2–3 weeks350 €house up to 120 m²

Prices exclude municipal, cadastre and utility fees — those are paid at their own rates.

What do I need for…

The documents in the order you get them

Choose what you are building and how big it is. You will see which documents the ZUT (the Spatial Development Act) requires, who issues them, how long they take and what they cost — for Smolyan and the region.

What are you building
Gross floor area
To the building permit12–23 weeksSurveys run in parallel, then design, approval and the permit.
Surveys and design5 580–7 890 €Excluding municipal and utility fees.
Of which with us4 500–6 000 €The design in all parts, under one contract.

Times and prices are a guide for Smolyan province, 2026. We give you the exact list at the site visit — it depends on the plan, the neighbours and any easements.

Wall section

How much insulation your wall needs

Choose the wall (the old Rhodope stone one is there too), the insulation and the town — you will see whether the wall meets the standard and how much money it saves a year.

The wall now
Insulation · λ 0.031 W/mK
12 cm
How you heat
Where the building is
m² · a 100 m² house on two floors has about 140
Brick 25 cm + graphite EPS 12 cmDetail · Scale 1:10
Section of the wall with its layers and the temperature through it

The line is the temperature through the wall on a cold day: +20 °C inside, −10 °C outside.

U-value of the wall

0.24W/m²K

✓Meets the standard with a margin. Ordinance No. RD-02-20-3 requires U ≤ 0.26 W/m²K for an external wall; the anchors are included in the U.

Saved compared with the uninsulated wall
degree-days per the ordinance
Smolyan · 3 600
per 1 m² of wall, at most
103 kWh/yr
for 140 m², at most
up to €870/yr
realistically, with normal heating
€350–520/yr
insulation, with labour
5 770 €
pays back in, realistically
11–17 years

“At most” — the whole house at 19 °C day and night. Realistically — 40–60%: old houses already use less than calculated, and insulation cannot save heat you do not use; closer to 40% if you heat only some of the rooms. Payback is based on the realistic figure.

Calculation layer by layer
Layers — from inside out
Layerd, cmλ, W/mKR = d/λ
Assumptions in the calculation
  • The formula. U = 1/(Rsi + Σd/λ + Rse) + the correction for anchors; Rsi = 0.13 and Rse = 0.04 m²K/W — per BDS EN ISO 6946. Linear thermal bridges (around windows, slabs and the plinth) are not in the wall’s U — they are calculated for the whole building.
  • The anchors add 0.02 W/m²K (Annex F of the standard): 6 per m², 0.003–0.004 W/K each according to the European Technical Assessments (ETA) of the anchors.
  • λ of the materials. Insulation — from the manufacturers’ declarations: white facade EPS 0.038, graphite 0.031, facade stone wool 0.036 W/mK. Masonry — per Annex 4 of Ordinance No. RD-02-20-3: hollow clay brick 0.52, aircrete 0.16, irregular stone 2.57 (item 5.7, the densest stone in the table — so for stone the saving is an upper limit).
  • The standard comes from Ordinance No. RD-02-20-3 of 2022 (Bulgaria’s energy-efficiency requirements for buildings), Table 2, item 1.1: external wall U ≤ 0.26 W/m²K; 0.30 is allowed only where the fire-safety rules require non-combustible insulation (class A1 or A2). “On the edge” — U is below the standard by less than 0.02.
  • Degree-days come from Annex 3 of the same ordinance, at 19 °C inside: Smolyan 3600 (240 heating days), Chepelare 3800, Devin and Madan 3000 each. “At most” = (U without insulation − U) × degree-days × 24 h — the whole house at 19 °C day and night, without the heat from people, appliances and the sun.
  • “Realistically” = 40–60% of that. Old houses use less than calculated — in Germany by 30% on average, and at a calculated 300 kWh/m²a by about 40% (Sunikka-Blank and Galvin, 2012, the so-called prebound effect). Insulation cannot save energy that is not being used; in the authors’ words, sometimes the saving is only half. Closer to 40% if only some rooms are heated, closer to 60% if the whole house is kept warm all the time.
  • Price of useful heat: wood €0.06/kWh (a stove at about 70% efficiency), air con €0.05/kWh (electricity through a heat pump), electric radiators €0.14/kWh, gas €0.07/kWh.
  • Price of insulation with adhesive, anchors, mesh, render and labour: white EPS €28 + €0.90, graphite €28 + €1.10, stone wool €36 + €1.50 per centimetre per m², without scaffolding.
  • This is a guide — an energy audit calculates the whole building.

Projects · 418 signed designs

Smolyan, Chepelare, Devin, Madan

Six of our latest projects, from the bureau’s register. In the Rhodopes almost every plot is on a slope — so the surveyor comes before the architect.

Site plan of the projects: three in Smolyan, one each in Chepelare, Devin and Madan. Degree-days per the ordinance: Chepelare 3800, Smolyan 3600, Devin and Madan 3000 each. 24°30′24°40′24°50′25°00′E41°50′ N41°40′ N41°30′ N N 0510 km 3000 DD 3800 DD 3600 DD 3000 DD 542163 Devin Chepelare Smolyan Madan
Site plan: the dots are at the towns’ coordinates, the crosses every 5′. The staffs show the degree-days per Ordinance No. RD-02-20-3: the taller, the colder — and the more insulation the wall needs.
  1. 1

    Detached house, 168 m²

    № 25-014 · 2025

    Raykovo district, Smolyan. Full design; the plot drops 4 m — a basement on the downhill side instead of a retaining wall.

    “A basement instead of a retaining wall: a boiler room and storage for the same money.” — Ivan K.
  2. 2

    Renovation of a block, 40 flats

    № 24-031 · 2024

    Smolyan. Audit, passport and design — from class E to class B.

  3. 3

    Technical passport for a workshop, 1,240 m²

    № 26-007 · 2026

    Madan. Reinforced-concrete frame from 1978; survey with trial pits.

  4. 4

    Attic storey on top

    № 25-022 · 2025

    Chepelare. A timber structure, so the old masonry is not overloaded; the roof is designed for Rhodope snow.

  5. 5

    Tolerance for a summer kitchen and garage

    № 26-011 · 2026

    Devin. Built in 1994 without permits: survey, structural report and tolerance certificate.

    “The garage stays — the certificate came in six weeks.” — Maria T.
  6. 6

    Flat → dental surgery

    № 25-037 · 2025

    Ustovo district, Smolyan. Consents, design in all parts, health inspectorate and fire service approvals.

    “The approvals were ready before the builders had finished.” — Dr N. P.

Who signs

Three designers, three stamps

Every design is signed by someone with a full design licence. See whose stamp is under your part.

Portrait of Eng. Plamen Kolev, structural engineer

Eng. Plamen Kolev

Structural engineer · KIIP, full licence

Full design licence in KIIP (the Chamber of Engineers in Investment Design), section “Structures of Buildings and Facilities”. 27 years of practice.

“On an old house I look at the foundations and the roof first. That is where most of the surprises are — better at the site visit than on the scaffolding.”
Portrait of Arch. Denitsa Marinova, architect

Arch. Denitsa Marinova

Architect · KAB, full licence

Full design licence in KAB, the Chamber of Architects in Bulgaria. Leads the architecture, changes of use and tolerance certificates for old buildings.

“For an old building without permits, I first ask when it was built. If it was before 31 March 2001, we get a tolerance certificate. If it is newer, I say so honestly at the first meeting, before anything has been paid.”
Portrait of Eng. Stefan Tsonev, energy efficiency

Eng. Stefan Tsonev

Energy efficiency · KIIP, full licence

Full design licence in KIIP for heating, ventilation and air conditioning. Does the energy audits and the renovation designs. Certifies only buildings the bureau has not designed and has not audited before the works — that is the law.

“On 25 cm brick, ten centimetres of polystyrene no longer meet the standard, and with the anchors twelve of white is just over it. We use 12 cm graphite or 15 cm white — the calculation is a little further up the page.”

Water and drainage, electrical, surveying and fire safety are signed by permanent partners with full design licences — the quote says who signs each part. The bureau is listed in the SEDA register for energy audits and building certification. Our KIIP, KAB and SEDA numbers are in the quote — check them in their public registers.

How we work

From the site visit to the occupancy certificate

  1. 1 day01

    Site visit

    We come on site, look at the documents and tell you what you need. Within 60 km of Smolyan — no extra charge.

  2. 2 days02

    Quote

    Price and time per part, written into the contract.

  3. 3–5 wks03

    Surveys

    Design visa, surveying, geology and connection terms from the water and electricity utilities — in parallel.

  4. 5–8 wks04

    Design

    The first architectural option — in 11 days on average. Then all parts, with the partners’ signatures.

  5. 4–10 wks05

    Approval and permit

    We submit the design to the municipality and follow the file through to the building permit.

  6. to occupancy06

    Designer’s supervision

    We come at every key stage: reinforcement, slabs, roof. We sign the records all the way to the occupancy certificate.

Questions

Before you sign the contract

How much does a house design cost?

For a house up to 120 m² GFA with all parts — from €3,600. For 200 m² it comes to €4,500–6,000 — the same as “What do I need” shows above. The price per part is in the quote and does not change unless you change the brief. Technical control of the structure and the energy-efficiency assessment are a separate contract between you and the independent engineers — from €300.

Can I start building while I wait for the permit?

No. Construction starts with a record of site opening and setting out of the building line and level — once the permit has taken effect. Without it the work is illegal and the municipality can stop it.

How long is an energy certificate valid?

Up to 10 years from issue (Energy Efficiency Act, Art. 47(1)). After a renovation a new certificate is made — it shows the building’s new class. It is made by a consultant who did not audit or design the renovation (Art. 43(4) and (6)) — if the design is ours, we recommend an independent one.

What is GFA and why does the price depend on it?

Gross floor area — the sum of the above-ground floor areas, measured to the outside of the walls. A bigger building means more sheets in every part and more calculations.

Do you do just one part for someone else’s design?

Yes. Most often the structural part and energy efficiency for another architect’s design. We work with their drawings in DWG.

Like this site?

Made by Parvi Sait — a site like this for your business costs from €390 as files you upload yourself. If we upload and maintain it — €490 plus €29 a month.

I want a site like this →
Statika engineering bureau · Smolyan · sample site, the details are fictitious Made by Parvi Sait
Sample siteI want a site like this →