ItemServiceWhat it includesTimeFrom
01House design
All parts: architecture, structures, water and drainage, electrical, energy efficiency, surveying, fire safety, health and safety plan and construction waste plan. Water and drainage, electrical, surveying and fire safety are signed by our permanent partners with full design licences. Technical control and the energy-efficiency assessment are separate, from €300.
5–8 weeks3 600 €up to 120 m² GFA
02Structural part
For another architect’s design: structural calculations, formwork and reinforcement drawings, details.
3–5 weeks€9/m²minimum €900
03Energy audit and certificate
Site visit, measurements, a model of the building, measures with a savings calculation and an energy performance certificate — for buildings we have not designed (ZEE, the Energy Efficiency Act, Art. 43(4)). Blocks of flats — on quote.
2–4 weeks420 €house up to 120 m²
04Renovation design
Insulation details around windows, balconies and the plinth; anchoring; fire safety of the facade.
3–5 weeks1 200 €house up to 120 m²
05Structural report
Before an extension, an extra storey, a new opening in a wall or buying an old house: site visit, trial pits if needed, a written report.
1–2 weeks220 €
06Tolerance certificate
Survey, structural report and the documents for the municipality. For a building put up without permits by 31 March 2001. A newer building without a permit cannot be legalised — we tell you so at the site visit.
4–11 weeks500 €up to 120 m²
07Technical passport
Under Ordinance No. 5 — renovation programmes require it. A survey of an existing building; the passport is drawn up by whoever surveyed it.
2–3 weeks350 €house up to 120 m²
Prices exclude municipal, cadastre and utility fees — those are paid at their own rates.